Friday 25 June 2004

Good Hope Hospital - Sutton Coldfield  
The application was to heat trace the chilled water and low temperature hot water pipework on both the ultrasound roof and endoscopy roofs. 600m of FBTBJO self regulating tape was supplied and installed to provide frost protection.

No comments:

Post a Comment