Maidstone Hospital
Provided frost protection to 120m of CWS pipework by supply and installing our VC constant wattage heating tape.
Bluestone Construction Site- Nuneaton
The project scope was to frost protect the external BIB tap.
HMS Collingwood - Fareham
Supplied and installed trace heating to the external chilled water pipework to maintain 3°C.
Andrew Corporation - USA
50 x 3.7m satellite dish heater panels designed and supplied to fit to the rear of satellite dish.
Barbourne Court - Worcester
Supplied and installed over 350m of FBTBOJ10/2 self limiting heating tape to the copper BCWS pipework over 3 floors.
Derriford Hospital - Plymouth
Supplied and installed a frost protection system to the hospitals chilled water flow and return system.
Village Hotel - Walsall
For this our second visit to the Village Hotel, ESH provided frost protection to the heating pipework situated on the hotels roof.
Russells Hall Hospital - Dudley
The project scope for this Russells Hall visit was to provide frost protection to the diesel pipework within the storage tank area.
Epson - Telford
Supplied and installed 300m of VC trace heating tape to provide frost protection to the factories sprinkler pipework.
New ASDA Store - Coryton
Supplied 1413m of WinterTrace constant wattage heating cable for the provision of frost protection.