Monday 22 November 2004

Maidstone Hospital 
Provided frost protection to 120m of CWS pipework by supply and installing our VC constant wattage heating tape.

Friday 12 November 2004

Bluestone Construction Site- Nuneaton
The project scope was to frost protect the external BIB tap.

Thursday 11 November 2004

HMS Collingwood - Fareham 
Supplied and installed trace heating to the external chilled water pipework to maintain 3°C.
Andrew Corporation - USA
50 x 3.7m satellite dish heater panels designed and supplied to fit to the rear of satellite dish.

Wednesday 10 November 2004

Barbourne Court - Worcester 
Supplied and installed over 350m of FBTBOJ10/2 self limiting heating tape to the copper BCWS pipework over 3 floors.    

Monday 8 November 2004

Derriford Hospital - Plymouth
Supplied and installed a frost protection system to the hospitals chilled water flow and return system.

Friday 5 November 2004

Village Hotel - Walsall
For this our second visit to the Village Hotel, ESH provided frost protection to the heating pipework situated on the hotels roof.

Thursday 4 November 2004

Russells Hall Hospital - Dudley
The project scope for this Russells Hall visit was to provide frost protection to the diesel pipework within the storage tank area.

Tuesday 2 November 2004

Epson - Telford
Supplied and installed 300m of VC trace heating tape to provide frost protection to the factories sprinkler pipework.
New ASDA Store - Coryton 
Supplied 1413m of WinterTrace constant wattage heating cable for the provision of frost protection.