Friday 30 January 2004

Mitcham Vale High School
Supplied and installed trace heating to provide temperature maintenance to the ground floor HWS boys and girls toilets as well as the visitors toilets in block A.

Thursday 29 January 2004

Tessenderlo Fine Chemicals Ltd - Leek
Supplied and installed hazardous area heating tape to various pipework all in ATEX certified zone 1 gas group 11B T4 classified areas. 600m of heating tape installed in total.

Monday 26 January 2004

Russells Hall Hospital - Dudley
ESH supplied and installed a frost protection system to the boosted cold water services to block A, within this Dudley based hospital.

Thursday 22 January 2004

Airbus UK - Chester
Supplied and installed a trace heating system to provide frost protection to a 400NB pipe in the balance pipework.

Tuesday 20 January 2004

Structurella AB - Sweden
Designed and supplied a 300mm diameter 100mm long insulation jacket.

Wednesday 14 January 2004

Andrew Corporation - USA
100 x 4.6m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday 12 January 2004

ACS & T Tewkesbury Ltd
Supplied and installed 6 heating units and junction boxes.

Friday 9 January 2004

Warwick University - Lakeside Development

Supplied and installed Trace Heating to the hot water service pipework in the west court. The Lakeside student accommodation project used over 700m of heating tape.

Thursday 8 January 2004

L'Oreal Manufacturing - Glamorgan 
ESH designed and supplied a heated hose 2.5m 75w 24v because we're worth it.