Thursday 26 February 2004

St Mary's Lower School - Kings Heath
Supplied and installed a temperature maintenance system to the hot water pipe in the junior toilets new extension.

Wednesday 25 February 2004

Russells Hall Hospital


Supplied, installed and commissioned the Frost Protection tape for the external water supplies. 640m of heating tape used in total.
White Rose Environmental Ltd - Nottingham
Supplied and installed a trace heating system on a cone to provide a temperature of +80°C in a minimum ambient of 0°C. The cone was 2.7m in hight, 3.25m diameter around the top and 300m diameter around the bottom.

Monday 23 February 2004

Brooklands Process Technology - Waybridge 
Designed and supplied 3 x metal clad heaters 2000W 110V.  

Friday 20 February 2004

Heartlands Hospital - Birmingham 
Frost protected the mains cold water copper pipework on the roof area.

Wednesday 18 February 2004

Maidstone Day Centre - Knightrider Street


Supplied and installed Trace Heating within this local charity's homeless centre, to provide temperature maintenance of a hot water system at 65°C. 450m of H20WAT65 installed.

http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-h2owatt.html

Tuesday 10 February 2004

Russells Hall Hospital - Dudley 
This time we supplied and installed a trace heating system to provide frost protection to the cold water pipe compound, chilled water pipework between block B and D and chiller pipework from plant room D to G.

Thursday 5 February 2004

ABB Ltd - Gloucestershire 
Designed and supplied two electrically heated jackets for the Guest & Chrimes Sluice Valves, for the application of frost/freezing protection.