Univar Ltd - Middlesbrough
Supplied and installed a temperature maintenance system to 2 large plastic tanks 2.85m diameter x 6.1m high, to maintain 10°C.
Spray Plant 2K Ltd - Leeds
Designed and supplied 2 x HSSD/1 110v 1000w silicone band drum heaters.
Village Hotel - Walsall
Supplied and installed a frost protection system of the external chiller pipework and buffer vessel.
Discovery Dock East - London
For these luxury apartments in Canary Wharf, ESH supplied and installed Frost Protection for the pipework services within the lower and upper basement levels, including water tank room/chilled plant room. 690m of VC constant wattage tape used in total.
Holiday Inn - Leicester
Supplied and installed trace heating to frost protect both external copper and plastic pipework.