Friday, 28 May 2004

Clan Clwyd Hospital - Bodelwyddan 
Supplied and installed 300m of self regulating heating tape for the purposes of frost protection.

Thursday, 20 May 2004

Ricoh UK Products Ltd - Telford
Supplied Ricoh with SCBX heating tape to be traced around the lower part of a vessel to provide heating to raise the temperature of the hopper contents from 15°C up to 40°C, in a T3 Temperature Classification area.

Wednesday, 19 May 2004

Good hope Hospital 



Provided and installed Trace Heating to Frost Protect chilled water and low temperature hot water pipework, on both the endoscopy and ultrasound roofs.

Wednesday, 12 May 2004

Russells Hall Hospital - Dudley
Supplied and installed trace heating to the cold water pipework on the water storage tank in block D and also to the new light oil pipework in the oil farm of block D.

Thursday, 6 May 2004

Quality Contracts Limited - Staffordshire
Supplied and installed a frost protection system to the chiller pipework.