Thursday, 16 December 2004

Aberthaw Power Station
Supplied our VCB constant wattage heating cable for installation within the power station.

Monday, 13 December 2004

Tellink - Belgium
For the leading Belgian telecom supplier, ESH designed and supplied 46 x 3.6m antenna heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Wednesday, 8 December 2004

Acetate Products Ltd - Derby
For this chemical products manufacturer, we were asked to maintain 80°C on 150mm, 100mm, 80mm and 50mm steel pipework. 

Tuesday, 7 December 2004

Keele University 
Supplied and installed trace heating for frost protection at +5°C against -15°C on the 54mm cold water pipework.

Thursday, 2 December 2004

JCB Hydrapower Ltd - Rugeley 
Supply and install of trace heating and thermal insulation to frost protect the sprinkler pipework.

Monday, 22 November 2004

Maidstone Hospital 
Provided frost protection to 120m of CWS pipework by supply and installing our VC constant wattage heating tape.

Friday, 12 November 2004

Bluestone Construction Site- Nuneaton
The project scope was to frost protect the external BIB tap.

Thursday, 11 November 2004

HMS Collingwood - Fareham 
Supplied and installed trace heating to the external chilled water pipework to maintain 3°C.
Andrew Corporation - USA
50 x 3.7m satellite dish heater panels designed and supplied to fit to the rear of satellite dish.

Wednesday, 10 November 2004

Barbourne Court - Worcester 
Supplied and installed over 350m of FBTBOJ10/2 self limiting heating tape to the copper BCWS pipework over 3 floors.    

Monday, 8 November 2004

Derriford Hospital - Plymouth
Supplied and installed a frost protection system to the hospitals chilled water flow and return system.

Friday, 5 November 2004

Village Hotel - Walsall
For this our second visit to the Village Hotel, ESH provided frost protection to the heating pipework situated on the hotels roof.

Thursday, 4 November 2004

Russells Hall Hospital - Dudley
The project scope for this Russells Hall visit was to provide frost protection to the diesel pipework within the storage tank area.

Tuesday, 2 November 2004

Epson - Telford
Supplied and installed 300m of VC trace heating tape to provide frost protection to the factories sprinkler pipework.
New ASDA Store - Coryton 
Supplied 1413m of WinterTrace constant wattage heating cable for the provision of frost protection.

Wednesday, 27 October 2004

Univar Ltd - Middlesbrough 
Supplied and installed a temperature maintenance system to 2 large plastic tanks 2.85m diameter x 6.1m high, to maintain 10°C.

Monday, 25 October 2004

Spray Plant 2K Ltd - Leeds
Designed and supplied 2 x HSSD/1 110v 1000w silicone band drum heaters.

Wednesday, 20 October 2004

Village Hotel - Walsall 
Supplied and installed a frost protection system of the external chiller pipework and buffer vessel.

Monday, 4 October 2004

Discovery Dock East - London
For these luxury apartments in Canary Wharf, ESH supplied and installed Frost Protection for the pipework services within the lower and upper basement levels, including water tank room/chilled plant room. 690m of VC constant wattage tape used in total.

Friday, 1 October 2004

Holiday Inn - Leicester
Supplied and installed trace heating to frost protect both external copper and plastic pipework.    

Monday, 27 September 2004

A B Engineering - Liverpool
Trace heating for the HWS pipe to maintain 55°C. ESH supplied and installed 50m of H2OWAT55.

Thursday, 9 September 2004

Troow Nutrition Ltd - Wincham 
Designed and supplied a IBC insulation jacket 1200mm x 110mm x 1100mm.

Wednesday, 25 August 2004

Suttons International Ltd - Widnes
Designed and supplied 3 large tanker valve jackets.

Monday, 23 August 2004

Kingswood School - High Wycombe
94m of H2OWAT55 was supplied and installed to the HWS pipework in the roof space, to maintain a temperature off 55°C.

Thursday, 19 August 2004

HTD Heat Trace Inc - USA
Designed and supplied 50 vacuum bakeout heating jackets.

Tuesday, 10 August 2004

Scunthorpe Works


This iron and steel plant owned by Corus UK required us to design, supply and install a BOS (basic oxygen steelmaker) vessel taphole heater.

Monday, 9 August 2004

Owler Brook Primary School - Sheffield 
Supplied VC constant wattage tape to provide frost protection to the schools sprinkler system.

Monday, 26 July 2004

ICEC Stoke Hospital
150m of FBTBOJ self regulating heating tape was supplied and installed to the AHU pipework.

Friday, 23 July 2004

Evans Vaccine - Liverpool
Trace heated the external chilled water flow and return pipework on the roof. Supplied and installed 95m of heating tape for this pharmaceutical manufacturer. 

Monday, 19 July 2004

Accordis Spondon
Supplied and installed trace heating to 60m of 3" Benzine pipework.

Monday, 12 July 2004

Corus UK Ltd - Scunthorpe 
Designed and supplied 4 large BOS vessel taphole heaters.

Friday, 25 June 2004

Good Hope Hospital - Sutton Coldfield  
The application was to heat trace the chilled water and low temperature hot water pipework on both the ultrasound roof and endoscopy roofs. 600m of FBTBJO self regulating tape was supplied and installed to provide frost protection.

Tuesday, 15 June 2004

Onyx UK Ltd - Maidenhead 
Supplied and installed trace heating and thermal insulation for the purpose of frost protecting 2" steel pipes.  

Wednesday, 9 June 2004

New Cross Hospital - Wolverhampton
Supplied and installed a frost protection system to the chilled water pipework in an external compound.

Friday, 4 June 2004

Accordis Spondon - Darby
Supplied and installed the trace heating system to the Benzene tank pipework, in a Temperature Class T4 Hazardous Area.

Friday, 28 May 2004

Clan Clwyd Hospital - Bodelwyddan 
Supplied and installed 300m of self regulating heating tape for the purposes of frost protection.

Thursday, 20 May 2004

Ricoh UK Products Ltd - Telford
Supplied Ricoh with SCBX heating tape to be traced around the lower part of a vessel to provide heating to raise the temperature of the hopper contents from 15°C up to 40°C, in a T3 Temperature Classification area.

Wednesday, 19 May 2004

Good hope Hospital 



Provided and installed Trace Heating to Frost Protect chilled water and low temperature hot water pipework, on both the endoscopy and ultrasound roofs.

Wednesday, 12 May 2004

Russells Hall Hospital - Dudley
Supplied and installed trace heating to the cold water pipework on the water storage tank in block D and also to the new light oil pipework in the oil farm of block D.

Thursday, 6 May 2004

Quality Contracts Limited - Staffordshire
Supplied and installed a frost protection system to the chiller pipework.

Tuesday, 27 April 2004

HTD Heat Trace Inc - USA
Supplied this New Jersey company with 4500m of VTCB constant wattage tape.

Tuesday, 13 April 2004

Andrew Corporation - USA
32 x 3.7m satellite dish heater panels designed and supplied.

Thursday, 1 April 2004

Russels Hall Hospital - Dudley
For this project ESH were back to the mortuary roof, this time to install frost protection to the overflow drains.

Friday, 19 March 2004

Unipet International Ltd - Kent
Supplied and installed over 300m of trace heating to 3 x 4m tall tanks and 40m of pipework for the purpose of temperature maintenance at 55°C.
B&Q Store & Broughton Hall - Staffordshire 
Supplied the trace heating tape to be installed at both these sites in Staffordshire.

Wednesday, 17 March 2004

Midland Press - Birmingham 
Supplied and installed a leak detection system manufactured by Raychem.

Monday, 15 March 2004

Corbett Hospital - Dudley
The project scope was to supply and install trace heating to provide frost protection to: 

  • 2" chilled flow and return pipework
  • 22mm copper boosted cold water 
  • buffer vessel plus pipework
  • dosing pot plus pipework

Tuesday, 9 March 2004

Unite Student Accommodation - Birmingham 
Supplied another 500m of H2OWAT55 to this large student accommodation project.

Monday, 1 March 2004

University Of Sussex - New Research Building
Supplied our VC constant wattage tape to be installed to the chilled water pipework.

Thursday, 26 February 2004

St Mary's Lower School - Kings Heath
Supplied and installed a temperature maintenance system to the hot water pipe in the junior toilets new extension.

Wednesday, 25 February 2004

Russells Hall Hospital


Supplied, installed and commissioned the Frost Protection tape for the external water supplies. 640m of heating tape used in total.
White Rose Environmental Ltd - Nottingham
Supplied and installed a trace heating system on a cone to provide a temperature of +80°C in a minimum ambient of 0°C. The cone was 2.7m in hight, 3.25m diameter around the top and 300m diameter around the bottom.

Monday, 23 February 2004

Brooklands Process Technology - Waybridge 
Designed and supplied 3 x metal clad heaters 2000W 110V.  

Friday, 20 February 2004

Heartlands Hospital - Birmingham 
Frost protected the mains cold water copper pipework on the roof area.

Wednesday, 18 February 2004

Maidstone Day Centre - Knightrider Street


Supplied and installed Trace Heating within this local charity's homeless centre, to provide temperature maintenance of a hot water system at 65°C. 450m of H20WAT65 installed.

http://www.traceheatingdirect.com/self-regulating-heating-tapes/self-regulating-heating-tape-type-h2owatt.html

Tuesday, 10 February 2004

Russells Hall Hospital - Dudley 
This time we supplied and installed a trace heating system to provide frost protection to the cold water pipe compound, chilled water pipework between block B and D and chiller pipework from plant room D to G.

Thursday, 5 February 2004

ABB Ltd - Gloucestershire 
Designed and supplied two electrically heated jackets for the Guest & Chrimes Sluice Valves, for the application of frost/freezing protection.

Friday, 30 January 2004

Mitcham Vale High School
Supplied and installed trace heating to provide temperature maintenance to the ground floor HWS boys and girls toilets as well as the visitors toilets in block A.

Thursday, 29 January 2004

Tessenderlo Fine Chemicals Ltd - Leek
Supplied and installed hazardous area heating tape to various pipework all in ATEX certified zone 1 gas group 11B T4 classified areas. 600m of heating tape installed in total.

Monday, 26 January 2004

Russells Hall Hospital - Dudley
ESH supplied and installed a frost protection system to the boosted cold water services to block A, within this Dudley based hospital.

Thursday, 22 January 2004

Airbus UK - Chester
Supplied and installed a trace heating system to provide frost protection to a 400NB pipe in the balance pipework.

Tuesday, 20 January 2004

Structurella AB - Sweden
Designed and supplied a 300mm diameter 100mm long insulation jacket.

Wednesday, 14 January 2004

Andrew Corporation - USA
100 x 4.6m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Monday, 12 January 2004

ACS & T Tewkesbury Ltd
Supplied and installed 6 heating units and junction boxes.

Friday, 9 January 2004

Warwick University - Lakeside Development

Supplied and installed Trace Heating to the hot water service pipework in the west court. The Lakeside student accommodation project used over 700m of heating tape.

Thursday, 8 January 2004

L'Oreal Manufacturing - Glamorgan 
ESH designed and supplied a heated hose 2.5m 75w 24v because we're worth it.